{"id":521,"date":"2026-07-30T11:23:20","date_gmt":"2026-07-30T09:23:20","guid":{"rendered":"https:\/\/fminstallazioni.it\/ecs-engineering\/"},"modified":"2026-09-15T12:09:29","modified_gmt":"2026-09-15T10:09:29","slug":"ecs-engineering","status":"publish","type":"page","link":"https:\/\/fminstallazioni.it\/en\/ecs-engineering\/","title":{"rendered":"ECS Engineering"},"content":{"rendered":"<h2>A key strength to build on<\/h2>\n<p>ECS is a BACS (Building Automation and Control System) that can raise a building&#8217;s energy efficiency class from Class D (low efficiency, without automation) to Class B (centralised, automated control), delivering tangible cost and sustainability benefits.<\/p>\n<h2>Lighting<\/h2>\n<p>Advanced lighting management and control: optimises switching schedules and remotely monitors faults, reducing consumption and improving indoor comfort.<\/p>\n<h2>Heating plant and HVAC<\/h2>\n<p>Control of heating plant, air conditioning and air handling. Improves energy efficiency and thermal comfort while maintaining appropriate air renewal and filtration.<\/p>\n<h2>Load management and consumption monitoring<\/h2>\n<p>Monitors energy load distribution in real time and acts to reduce waste, improving overall system efficiency.<\/p>\n<h2>Multi-site<\/h2>\n<p>Designed for organisations with multiple sites: monitors and manages systems in different buildings from one central workstation.<\/p>\n<h2>Answers to frequently asked questions<\/h2>\n<h2>Find answers to your questions<\/h2>\n<p>We have gathered the most frequently asked questions to help you understand how we work and what we can do for you.<\/p>\n<h2>Do you cover all building systems or only certain types?<\/h2>\n<p>We cover a building&#8217;s entire technical infrastructure: electrical, heating and plumbing systems, fire protection and security, through to intelligent remote management. Our integrated approach eliminates fragmentation between suppliers: we design each installation in relation to the others, so that they operate as a single coordinated system.<\/p>\n<h2>Do you provide support after installation?<\/h2>\n<p>Yes. Maintenance is central to our service. We offer scheduled, full-service and tailored maintenance contracts, with emergency call-outs available 24 hours a day, 365 days a year. For each installation, we provide detailed asset condition reports and keep the technical documentation up to date.<\/p>\n<h2>Is the ECS Engineering system compatible with existing installations?<\/h2>\n<p>Yes. We integrate installations from any manufacturer using open protocols, avoiding replacement where it is unnecessary.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The energy you generate is the energy you save.<\/p>\n","protected":false},"author":0,"featured_media":0,"parent":0,"menu_order":28,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-521","page","type-page","status-publish","hentry"],"acf":{"fm_page_content":{"enabled":true,"hero":{"label":"ECS Engineering","title":"ECS Engineering","lead":"The energy you generate is the energy you save.","image":522,"image_alt":""},"card":{"label":"ECS Engineering","title":"ECS Engineering","summary":"The energy you generate is the energy you save.","image":522,"image_alt":""},"blocks":[{"acf_fc_layout":"heading","content":"A key strength to build on","level":"2"},{"acf_fc_layout":"paragraph","content":"ECS is a BACS (Building Automation and Control System) that can raise a building's energy efficiency class from Class D (low efficiency, without automation) to Class B (centralised, automated control), delivering tangible cost and sustainability benefits."},{"acf_fc_layout":"heading","content":"Lighting","level":"2"},{"acf_fc_layout":"paragraph","content":"Advanced lighting management and control: optimises switching schedules and remotely monitors faults, reducing consumption and improving indoor comfort."},{"acf_fc_layout":"heading","content":"Heating plant and HVAC","level":"2"},{"acf_fc_layout":"paragraph","content":"Control of heating plant, air conditioning and air handling. Improves energy efficiency and thermal comfort while maintaining appropriate air renewal and filtration."},{"acf_fc_layout":"heading","content":"Load management and consumption monitoring","level":"2"},{"acf_fc_layout":"paragraph","content":"Monitors energy load distribution in real time and acts to reduce waste, improving overall system efficiency."},{"acf_fc_layout":"heading","content":"Multi-site","level":"2"},{"acf_fc_layout":"paragraph","content":"Designed for organisations with multiple sites: monitors and manages systems in different buildings from one central workstation."},{"acf_fc_layout":"heading","content":"Answers to frequently asked questions","level":"2"},{"acf_fc_layout":"heading","content":"Find answers to your questions","level":"2"},{"acf_fc_layout":"paragraph","content":"We have gathered the most frequently asked questions to help you understand how we work and what we can do for you."},{"acf_fc_layout":"heading","content":"Do you cover all building systems or only certain types?","level":"2"},{"acf_fc_layout":"paragraph","content":"We cover a building's entire technical infrastructure: electrical, heating and plumbing systems, fire protection and security, through to intelligent remote management. Our integrated approach eliminates fragmentation between suppliers: we design each installation in relation to the others, so that they operate as a single coordinated system."},{"acf_fc_layout":"heading","content":"Do you provide support after installation?","level":"2"},{"acf_fc_layout":"paragraph","content":"Yes. Maintenance is central to our service. We offer scheduled, full-service and tailored maintenance contracts, with emergency call-outs available 24 hours a day, 365 days a year. For each installation, we provide detailed asset condition reports and keep the technical documentation up to date."},{"acf_fc_layout":"heading","content":"Is the ECS Engineering system compatible with existing installations?","level":"2"},{"acf_fc_layout":"paragraph","content":"Yes. We integrate installations from any manufacturer using open protocols, avoiding replacement where it is unnecessary."}],"gallery":"","media":{"title":"","items":"","slots":null},"details":{"project_client":"","project_location":"","project_activity":"","stats":null,"capabilities":[{"key":"lighting","title":"Lighting","copy":"Advanced lighting management and control: optimises switching schedules and remotely monitors faults, reducing consumption and improving indoor comfort.","icon":""},{"key":"hvac","title":"Heating plant and HVAC","copy":"Control of heating plant, air conditioning and air handling. Improves energy efficiency and thermal comfort while maintaining appropriate air renewal and filtration.","icon":""},{"key":"loads","title":"Load management and consumption monitoring","copy":"Monitors energy load distribution in real time and acts to reduce waste, improving overall system efficiency.","icon":""},{"key":"remote","title":"Remote control","copy":"Remote supervision and control of systems, alarms and operating parameters from a single interface.","icon":""},{"key":"multisite","title":"Multi-site","copy":"Designed for organisations with multiple sites: monitors and manages systems in different buildings from one central workstation.","icon":""}],"sector_cards":null,"template_texts":[{"key":"ecs_hero_eyebrow","label":"Hero: soprattitolo","text":"FM Installazioni \/ Innovation"},{"key":"ecs_hero_chapter","label":"Hero: capitolo","text":"ECS \/ 01\u201403"},{"key":"ecs_hero_title_small","label":"Hero: titolo, riga piccola","text":"ECS"},{"key":"ecs_hero_title_main","label":"Hero: titolo, riga principale","text":"Engineering"},{"key":"ecs_hero_lead_label","label":"Hero: etichetta introduzione","text":"Energy under control"},{"key":"ecs_hero_stage_1","label":"Hero: fase 1","text":"Measure"},{"key":"ecs_hero_stage_2","label":"Hero: fase 2","text":"Control"},{"key":"ecs_hero_stage_3","label":"Hero: fase 3","text":"Optimise"},{"key":"ecs_hero_stages_aria_label","label":"Hero: etichetta accessibile fasi","text":"Energy control stages"},{"key":"ecs_hero_scroll_label","label":"Hero: etichetta scorrimento","text":"Scroll"},{"key":"ecs_demo_intro_title","label":"Demo: titolo introduzione","text":"See what is happening in your building, in real time."},{"key":"ecs_demo_intro_copy","label":"Demo: testo introduzione","text":"Explore a demonstration installation: compare consumption, identify an anomaly and simulate a corrective action."},{"key":"ecs_demo_disclaimer","label":"Demo: avviso dati","text":"Demo environment \u00b7 simulated data"},{"key":"ecs_demo_logo_alt","label":"Demo: testo alternativo logo","text":"ECS \u2014 Energy Control Engineering"},{"key":"ecs_demo_brand_context","label":"Demo: contesto","text":"Demonstration building"},{"key":"ecs_demo_connection_aria","label":"Demo: etichetta accessibile stato sistema","text":"System status"},{"key":"ecs_demo_connection_status","label":"Demo: stato connessione","text":"System connected"},{"key":"ecs_demo_connection_count","label":"Demo: conteggio connessione","text":"12\/12 systems online"},{"key":"ecs_demo_metrics_aria","label":"Demo: etichetta accessibile indicatori","text":"Key indicators"},{"key":"ecs_demo_metric_power_label","label":"Demo: indicatore potenza","text":"Instantaneous power"},{"key":"ecs_demo_metric_power_delta","label":"Demo: variazione potenza iniziale","text":"\u22123.2% over the last hour"},{"key":"ecs_demo_metric_solar_label","label":"Demo: indicatore fotovoltaico","text":"Photovoltaic self-consumption"},{"key":"ecs_demo_metric_solar_delta","label":"Demo: variazione fotovoltaico","text":"24.6 kW currently generated"},{"key":"ecs_demo_metric_saving_label","label":"Demo: indicatore riduzione","text":"Reduction vs baseline"},{"key":"ecs_demo_metric_saving_delta","label":"Demo: variazione riduzione iniziale","text":"demonstration estimate"},{"key":"ecs_demo_range_day_label","label":"Demo: etichetta energia giorno","text":"Energy \u00b7 24 hours"},{"key":"ecs_demo_range_day_summary","label":"Demo: sintesi grafico giorno","text":"Power demand over the last 24 hours."},{"key":"ecs_demo_range_day_description","label":"Demo: descrizione grafico giorno","text":"Actual consumption compared with the expected profile over the last 24 hours."},{"key":"ecs_demo_range_day_axis_1","label":"Demo: asse giorno 1","text":"00:00"},{"key":"ecs_demo_range_day_axis_2","label":"Demo: asse giorno 2","text":"06:00"},{"key":"ecs_demo_range_day_axis_3","label":"Demo: asse giorno 3","text":"12:00"},{"key":"ecs_demo_range_day_axis_4","label":"Demo: asse giorno 4","text":"18:00"},{"key":"ecs_demo_range_day_axis_5","label":"Demo: asse giorno 5","text":"Time"},{"key":"ecs_demo_range_week_label","label":"Demo: etichetta energia settimana","text":"Energy \u00b7 7 days"},{"key":"ecs_demo_range_week_summary","label":"Demo: sintesi grafico settimana","text":"Daily energy use over the last 7 days."},{"key":"ecs_demo_range_week_description","label":"Demo: descrizione grafico settimana","text":"Actual energy use compared with the expected profile over the last 7 days."},{"key":"ecs_demo_range_week_axis_1","label":"Demo: asse settimana 1","text":"Mon"},{"key":"ecs_demo_range_week_axis_2","label":"Demo: asse settimana 2","text":"Tue"},{"key":"ecs_demo_range_week_axis_3","label":"Demo: asse settimana 3","text":"Wed"},{"key":"ecs_demo_range_week_axis_4","label":"Demo: asse settimana 4","text":"Fri"},{"key":"ecs_demo_range_week_axis_5","label":"Demo: asse settimana 5","text":"Sun"},{"key":"ecs_demo_range_month_label","label":"Demo: etichetta energia mese","text":"Energy \u00b7 30 days"},{"key":"ecs_demo_range_month_summary","label":"Demo: sintesi grafico mese","text":"Average daily energy use over the last 30 days."},{"key":"ecs_demo_range_month_description","label":"Demo: descrizione grafico mese","text":"Actual energy use compared with the expected profile over the last 30 days."},{"key":"ecs_demo_range_month_axis_1","label":"Demo: asse mese 1","text":"1"},{"key":"ecs_demo_range_month_axis_2","label":"Demo: asse mese 2","text":"8"},{"key":"ecs_demo_range_month_axis_3","label":"Demo: asse mese 3","text":"15"},{"key":"ecs_demo_range_month_axis_4","label":"Demo: asse mese 4","text":"22"},{"key":"ecs_demo_range_month_axis_5","label":"Demo: asse mese 5","text":"30"},{"key":"ecs_demo_trend_title","label":"Demo: titolo grafico","text":"Actual consumption and expected profile"},{"key":"ecs_demo_range_aria","label":"Demo: etichetta accessibile intervallo","text":"Chart period"},{"key":"ecs_demo_range_day_button","label":"Demo: intervallo giorno","text":"24 hours"},{"key":"ecs_demo_range_week_button","label":"Demo: intervallo settimana","text":"7 days"},{"key":"ecs_demo_range_month_button","label":"Demo: intervallo mese","text":"30 days"},{"key":"ecs_demo_legend_aria","label":"Demo: etichetta accessibile legenda","text":"Chart series"},{"key":"ecs_demo_legend_actual","label":"Demo: legenda consumo reale","text":"Actual consumption"},{"key":"ecs_demo_legend_profile","label":"Demo: legenda profilo","text":"Expected profile"},{"key":"ecs_demo_legend_initial","label":"Demo: legenda scenario iniziale","text":"Initial scenario"},{"key":"ecs_demo_legend_optimized","label":"Demo: legenda scenario ottimizzato","text":"Optimised scenario"},{"key":"ecs_demo_chart_title","label":"Demo: titolo accessibile grafico","text":"Demonstration consumption trend"},{"key":"ecs_demo_chart_suffix","label":"Demo: descrizione scenario ottimizzato","text":"The blue line shows the initial scenario and the green line the optimised scenario."},{"key":"ecs_demo_loads_title","label":"Demo: titolo assorbimento","text":"Power demand by subsystem"},{"key":"ecs_demo_load_total_initial","label":"Demo: totale assorbimento iniziale","text":"24.0 kW monitored"},{"key":"ecs_demo_load_total_optimized","label":"Demo: totale assorbimento ottimizzato","text":"21.9 kW monitored"},{"key":"ecs_demo_load_hvac_label","label":"Demo: carico HVAC","text":"AHU \/ HVAC"},{"key":"ecs_demo_load_lighting_label","label":"Demo: carico illuminazione","text":"Lighting"},{"key":"ecs_demo_load_thermal_label","label":"Demo: carico centrale","text":"Heating plant"},{"key":"ecs_demo_load_pumps_label","label":"Demo: carico pompe","text":"Pumps"},{"key":"ecs_demo_systems_title","label":"Demo: titolo impianti","text":"Monitored systems"},{"key":"ecs_demo_systems_copy","label":"Demo: testo impianti","text":"Select an asset to view its details."},{"key":"ecs_demo_attention_initial","label":"Demo: attenzione iniziale","text":"1 alert"},{"key":"ecs_demo_attention_optimized","label":"Demo: attenzione ottimizzata","text":"Optimisation active"},{"key":"ecs_demo_assets_aria","label":"Demo: etichetta accessibile asset","text":"Building assets"},{"key":"ecs_demo_detail_primary_label","label":"Demo: etichetta dettaglio 1","text":"Power"},{"key":"ecs_demo_detail_secondary_label","label":"Demo: etichetta dettaglio 2","text":"Room temperature"},{"key":"ecs_demo_detail_tertiary_label","label":"Demo: etichetta dettaglio 3","text":"Air quality"},{"key":"ecs_demo_saving_label","label":"Demo: etichetta risparmio","text":"Savings"},{"key":"ecs_demo_saving_aria","label":"Demo: etichetta accessibile risparmio","text":"Estimated savings: 2.1 kilowatts"},{"key":"ecs_demo_hvac_nav_label","label":"Demo: asset HVAC","text":"AHU \/ HVAC"},{"key":"ecs_demo_hvac_nav_meta","label":"Demo: stato sintetico HVAC","text":"UTA-02 \u00b7 check required"},{"key":"ecs_demo_lighting_nav_label","label":"Demo: asset illuminazione","text":"Lighting"},{"key":"ecs_demo_lighting_nav_meta","label":"Demo: stato sintetico illuminazione","text":"LUX-01 \u00b7 normal"},{"key":"ecs_demo_solar_nav_label","label":"Demo: asset fotovoltaico","text":"Photovoltaics"},{"key":"ecs_demo_solar_nav_meta","label":"Demo: stato sintetico fotovoltaico","text":"FV-01 \u00b7 generating"},{"key":"ecs_demo_thermal_nav_label","label":"Demo: asset centrale termica","text":"Heating plant"},{"key":"ecs_demo_thermal_nav_meta","label":"Demo: stato sintetico centrale termica","text":"PDC-01 \u00b7 modulating"},{"key":"ecs_demo_pumps_nav_label","label":"Demo: asset pompe","text":"Pumps and circuits"},{"key":"ecs_demo_pumps_nav_meta","label":"Demo: stato sintetico pompe","text":"POM-03 \u00b7 normal"},{"key":"ecs_demo_asset_hvac_title","label":"Demo: dettaglio HVAC","text":"Air handling unit"},{"key":"ecs_demo_asset_hvac_status","label":"Demo: stato HVAC","text":"Attention required"},{"key":"ecs_demo_asset_hvac_insight","label":"Demo: nota HVAC","text":"Power demand is 18% above the expected profile."},{"key":"ecs_demo_asset_lighting_title","label":"Demo: dettaglio illuminazione","text":"Common area lighting"},{"key":"ecs_demo_asset_lighting_status","label":"Demo: stato illuminazione","text":"Normal"},{"key":"ecs_demo_asset_lighting_insight","label":"Demo: nota illuminazione","text":"Switching matches the schedule and detected occupancy."},{"key":"ecs_demo_asset_solar_title","label":"Demo: dettaglio fotovoltaico","text":"Photovoltaic system"},{"key":"ecs_demo_asset_solar_status","label":"Demo: stato fotovoltaico","text":"Generating"},{"key":"ecs_demo_asset_solar_insight","label":"Demo: nota fotovoltaico","text":"Generation covers most of the instantaneous demand."},{"key":"ecs_demo_asset_thermal_title","label":"Demo: dettaglio centrale termica","text":"Heating plant"},{"key":"ecs_demo_asset_thermal_status","label":"Demo: stato centrale termica","text":"Normal"},{"key":"ecs_demo_asset_thermal_insight","label":"Demo: nota centrale termica","text":"The heat pump is operating within the expected efficiency range."},{"key":"ecs_demo_asset_pumps_title","label":"Demo: dettaglio pompe","text":"Pumps and circuits"},{"key":"ecs_demo_asset_pumps_status","label":"Demo: stato pompe","text":"Normal"},{"key":"ecs_demo_asset_pumps_insight","label":"Demo: nota pompe","text":"Pressure is stable and automatic pump alternation is normal."},{"key":"ecs_demo_status_optimized","label":"Demo: stato HVAC ottimizzato","text":"Optimised"},{"key":"ecs_demo_hvac_meta_optimized","label":"Demo: stato sintetico HVAC ottimizzato","text":"UTA-02 \u00b7 optimised"},{"key":"ecs_demo_hvac_insight_optimized","label":"Demo: nota HVAC ottimizzata","text":"Time schedule updated."},{"key":"ecs_demo_hvac_saving_aria","label":"Demo: risparmio HVAC accessibile","text":"Estimated savings: 2.1 kilowatts."},{"key":"ecs_demo_no_saving_aria","label":"Demo: nessun risparmio accessibile","text":"No estimated savings for this system."},{"key":"ecs_demo_power_delta_optimized","label":"Demo: variazione potenza ottimizzata","text":"\u22122.1 kW after simulation"},{"key":"ecs_demo_energy_delta_initial","label":"Demo: variazione energia iniziale","text":"profile within threshold"},{"key":"ecs_demo_energy_delta_optimized","label":"Demo: variazione energia ottimizzata","text":"\u2212{saved} {unit} estimated"},{"key":"ecs_demo_saving_delta_optimized","label":"Demo: variazione riduzione ottimizzata","text":"estimate after simulation"},{"key":"ecs_demo_action_title_initial","label":"Demo: titolo azione iniziale","text":"HVAC anomaly detected"},{"key":"ecs_demo_action_copy_initial","label":"Demo: testo azione iniziale","text":"Ventilation is using 2.1 kW more than necessary. Try a demonstration adjustment to the time schedule."},{"key":"ecs_demo_action_label_initial","label":"Demo: azione iniziale","text":"Simulate optimisation"},{"key":"ecs_demo_action_title_optimized","label":"Demo: titolo azione ottimizzata","text":"Optimisation simulated"},{"key":"ecs_demo_action_copy_optimized","label":"Demo: testo azione ottimizzata","text":"AHU power reduced by 2.1 kW during active periods. The chart compares the initial and optimised scenarios."},{"key":"ecs_demo_action_label_optimized","label":"Demo: azione ottimizzata","text":"Reset scenario"},{"key":"ecs_demo_scenario_announcement","label":"Demo: annuncio scenario","text":"Optimised scenario: from {energy} to {optimized} {unit}; estimated potential savings of {saved} {unit}, equivalent to {percent}%."},{"key":"ecs_demo_live_chart_prefix","label":"Demo: annuncio aggiornamento grafico","text":"Chart updated"},{"key":"ecs_demo_live_status_label","label":"Demo: etichetta stato annuncio","text":"Status"},{"key":"ecs_demo_live_reset","label":"Demo: annuncio ripristino","text":"Scenario reset. The HVAC anomaly is visible again."},{"key":"ecs_capabilities_title","label":"ECS: titolo capacit\u00e0","text":"A key strength to build on"},{"key":"ecs_capabilities_topology_aria","label":"ECS: etichetta accessibile topologia","text":"Controlled system topology"},{"key":"ecs_capabilities_hub_label","label":"ECS: etichetta hub","text":"Control hub"},{"key":"ecs_capabilities_tabs_aria","label":"ECS: etichetta accessibile ambiti","text":"Controlled areas"},{"key":"ecs_capabilities_status","label":"ECS: stato capacit\u00e0","text":"Controlled system"},{"key":"ecs_method_title","label":"ECS: titolo metodo","text":"Three stages, one responsible partner."}],"template_images":[{"key":"ecs_logo","label":"ECS logo (optional transparent PNG\/WebP)","image":"","alt":"ECS \u2014 Energy Control Engineering"}],"template_links":[{"key":"ecs_external_site","label":"Link to the ECS website","text":"Visit the ECS website","path":"https:\/\/energycontrolsystem.it\/"}]}}},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>ECS Engineering | FM<\/title>\n<meta name=\"description\" content=\"ECS Engineering supports FM with design, innovation and energy efficiency for integrated building systems.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/fminstallazioni.it\/en\/ecs-engineering\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ECS Engineering | FM\" \/>\n<meta property=\"og:description\" content=\"ECS Engineering supports FM with design, innovation and energy efficiency for integrated building systems.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/fminstallazioni.it\/en\/ecs-engineering\/\" \/>\n<meta property=\"og:site_name\" content=\"FM\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/FMinstallazioni\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-15T10:09:29+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/fminstallazioni.it\/wp-content\/uploads\/2026\/08\/fm-esg.jpg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/fminstallazioni.it\/wp-content\/uploads\/2026\/08\/fm-esg.jpg\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/fminstallazioni.it\\\/en\\\/ecs-engineering\\\/\",\"url\":\"https:\\\/\\\/fminstallazioni.it\\\/en\\\/ecs-engineering\\\/\",\"name\":\"ECS Engineering | FM\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/fminstallazioni.it\\\/en\\\/#website\"},\"datePublished\":\"2026-07-30T09:23:20+00:00\",\"dateModified\":\"2026-09-15T10:09:29+00:00\",\"description\":\"ECS Engineering supports FM with design, innovation and energy efficiency for integrated building systems.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/fminstallazioni.it\\\/en\\\/ecs-engineering\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/fminstallazioni.it\\\/en\\\/ecs-engineering\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/fminstallazioni.it\\\/en\\\/ecs-engineering\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/fminstallazioni.it\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ECS Engineering\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/fminstallazioni.it\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/fminstallazioni.it\\\/en\\\/\",\"name\":\"FM\",\"description\":\"Integrated Building Systems\",\"publisher\":{\"@id\":\"https:\\\/\\\/fminstallazioni.it\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/fminstallazioni.it\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/fminstallazioni.it\\\/en\\\/#organization\",\"name\":\"FM\",\"alternateName\":\"Sistemi Impiantistici Integrati\",\"url\":\"https:\\\/\\\/fminstallazioni.it\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/fminstallazioni.it\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/fminstallazioni.it\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/logo-fm-installazioni.png\",\"contentUrl\":\"https:\\\/\\\/fminstallazioni.it\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/logo-fm-installazioni.png\",\"width\":498,\"height\":120,\"caption\":\"FM\"},\"image\":{\"@id\":\"https:\\\/\\\/fminstallazioni.it\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/FMinstallazioni\",\"https:\\\/\\\/it.linkedin.com\\\/company\\\/fminstallazionisrl\"],\"legalName\":\"FM S.r.l.\",\"email\":\"info@fminstallazioni.it\",\"telephone\":\"+39 041 8696460\",\"vatID\":\"IT 03990590261\",\"taxID\":\"03990590261\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Via Botticelli, 4\",\"addressLocality\":\"Mogliano Veneto\",\"addressRegion\":\"TV\",\"postalCode\":\"31021\",\"addressCountry\":\"IT\"},\"geo\":{\"@type\":\"GeoCoordinates\",\"latitude\":45.5880156,\"longitude\":12.2985664},\"hasMap\":\"https:\\\/\\\/www.google.com\\\/maps\\\/dir\\\/?api=1&destination=Via%20Botticelli%2C%204%2C%2031021%20Mogliano%20Veneto%20%28TV%29\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"ECS Engineering | FM","description":"ECS Engineering supports FM with design, innovation and energy efficiency for integrated building systems.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/fminstallazioni.it\/en\/ecs-engineering\/","og_locale":"en_US","og_type":"article","og_title":"ECS Engineering | FM","og_description":"ECS Engineering supports FM with design, innovation and energy efficiency for integrated building systems.","og_url":"https:\/\/fminstallazioni.it\/en\/ecs-engineering\/","og_site_name":"FM","article_publisher":"https:\/\/www.facebook.com\/FMinstallazioni","article_modified_time":"2026-09-15T10:09:29+00:00","og_image":[{"url":"https:\/\/fminstallazioni.it\/wp-content\/uploads\/2026\/08\/fm-esg.jpg","type":"","width":"","height":""}],"twitter_card":"summary_large_image","twitter_image":"https:\/\/fminstallazioni.it\/wp-content\/uploads\/2026\/08\/fm-esg.jpg","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/fminstallazioni.it\/en\/ecs-engineering\/","url":"https:\/\/fminstallazioni.it\/en\/ecs-engineering\/","name":"ECS Engineering | FM","isPartOf":{"@id":"https:\/\/fminstallazioni.it\/en\/#website"},"datePublished":"2026-07-30T09:23:20+00:00","dateModified":"2026-09-15T10:09:29+00:00","description":"ECS Engineering supports FM with design, innovation and energy efficiency for integrated building systems.","breadcrumb":{"@id":"https:\/\/fminstallazioni.it\/en\/ecs-engineering\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/fminstallazioni.it\/en\/ecs-engineering\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/fminstallazioni.it\/en\/ecs-engineering\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/fminstallazioni.it\/en\/"},{"@type":"ListItem","position":2,"name":"ECS Engineering"}]},{"@type":"WebSite","@id":"https:\/\/fminstallazioni.it\/en\/#website","url":"https:\/\/fminstallazioni.it\/en\/","name":"FM","description":"Integrated Building Systems","publisher":{"@id":"https:\/\/fminstallazioni.it\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/fminstallazioni.it\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/fminstallazioni.it\/en\/#organization","name":"FM","alternateName":"Sistemi Impiantistici Integrati","url":"https:\/\/fminstallazioni.it\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/fminstallazioni.it\/en\/#\/schema\/logo\/image\/","url":"https:\/\/fminstallazioni.it\/wp-content\/uploads\/2026\/07\/logo-fm-installazioni.png","contentUrl":"https:\/\/fminstallazioni.it\/wp-content\/uploads\/2026\/07\/logo-fm-installazioni.png","width":498,"height":120,"caption":"FM"},"image":{"@id":"https:\/\/fminstallazioni.it\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/FMinstallazioni","https:\/\/it.linkedin.com\/company\/fminstallazionisrl"],"legalName":"FM S.r.l.","email":"info@fminstallazioni.it","telephone":"+39 041 8696460","vatID":"IT 03990590261","taxID":"03990590261","address":{"@type":"PostalAddress","streetAddress":"Via Botticelli, 4","addressLocality":"Mogliano Veneto","addressRegion":"TV","postalCode":"31021","addressCountry":"IT"},"geo":{"@type":"GeoCoordinates","latitude":45.5880156,"longitude":12.2985664},"hasMap":"https:\/\/www.google.com\/maps\/dir\/?api=1&destination=Via%20Botticelli%2C%204%2C%2031021%20Mogliano%20Veneto%20%28TV%29"}]}},"_links":{"self":[{"href":"https:\/\/fminstallazioni.it\/en\/wp-json\/wp\/v2\/pages\/521","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/fminstallazioni.it\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/fminstallazioni.it\/en\/wp-json\/wp\/v2\/types\/page"}],"replies":[{"embeddable":true,"href":"https:\/\/fminstallazioni.it\/en\/wp-json\/wp\/v2\/comments?post=521"}],"version-history":[{"count":1,"href":"https:\/\/fminstallazioni.it\/en\/wp-json\/wp\/v2\/pages\/521\/revisions"}],"predecessor-version":[{"id":523,"href":"https:\/\/fminstallazioni.it\/en\/wp-json\/wp\/v2\/pages\/521\/revisions\/523"}],"wp:attachment":[{"href":"https:\/\/fminstallazioni.it\/en\/wp-json\/wp\/v2\/media?parent=521"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}